Above-ceiling view of fire-rated barriers and cable trays in a hospital corridor
Fire Safety Specialists

Total Fire Compliance.Zero Risk.

Firestopping, barrier integrity, and life safety solutions built for inspection readiness — engineered for the facilities where compliance is not optional.

UL Listed Systems
NFPA 101 / IBC
Joint Commission Ready
Total Fire Compliance crest — Fire Safety Specialists

Trusted by facilities where compliance is not optional

Healthcare Systems
Commercial REITs
Government Contracts
Industrial Facilities
AHJ Certified
Joint Commission

Why Total Fire Compliance

We don't just install firestop — we eliminate compliance risk.

Failed inspections cost time, capital, and reputation. Our work is engineered, documented, and built to pass — the first time.

100%
Pass rate
24h
Report turnaround
UL
Listed systems

Healthcare-focused expertise

Deep experience in active patient-care environments and infection-control protocols.

Inspection-ready execution

Every job documented, photographed, and ready to present to the AHJ.

Code-driven approach

UL listings, NFPA standards, and IBC requirements baked into every system.

Fast turnaround + documentation

Turn deficiency reports around quickly without sacrificing accuracy.

Scalable for large facilities

Multi-floor hospital campuses and multi-site portfolios — we move at your pace.

Our Process

A precise, documented path to compliance.

01

Inspect

Comprehensive walk-through of every barrier and assembly.

02

Identify Deficiencies

Document non-compliance with photo evidence and locations.

03

Correct & Install

Apply UL-listed systems; restore rated integrity.

04

Document

Deliver inspection-ready records and barrier maps.

05

Inspection-Ready

Hand off a facility built to pass — every time.

Industries Served

Built for the toughest compliance environments.

Healthcare
Primary Focus

Healthcare

Hospitals, surgical centers, behavioral health

Commercial Buildings
Class A

Commercial Buildings

Offices, mixed-use, hospitality

Government Facilities
Federal & State

Government Facilities

Courthouses, agencies, secure sites

Industrial
Manufacturing

Industrial

Plants, warehouses, distribution

Case Studies

Real facilities. Documented outcomes.

Before-and-after documentation from the projects that defined our standard. Download the full case file or jump to the service.

  • Zero deficiencies

    Firestop Inspection & Installation

    200-bed regional hospital

    1,400+ penetrations remediated and barrier-mapped ahead of Joint Commission survey — zero deficiencies cited.

  • 6 floors · 0 downtime

    Firestop Inspection & Installation

    Federal courthouse renovation

    Phased above-ceiling firestop install across 6 floors with no occupied-floor disruption.

  • 92% closed in 90 days

    Above-Ceiling Compliance

    Multi-campus hospital system

    Surveyed 4M sqft above-ceiling — delivered prioritized remediation plan that closed 92% of citations within 90 days.

  • 1,800 barriers mapped

    Above-Ceiling Compliance

    University medical center

    Mapped 1,800 barriers across 3 towers; pre-survey walk eliminated all critical findings.

  • 4 tons removed · 22 floors

    Cable Management & Clearance

    Class A office tower

    Removed 4 tons of abandoned cable and restored sprinkler clearances on 22 floors.

  • 11,000 LF re-supported

    Cable Management & Clearance

    Data-center support floor

    Re-supported 11,000 LF of low-voltage cable to NEC standards in a single phase.

  • 600+ putty pads

    Electrical Box Compliance

    Behavioral health unit

    Installed 600+ putty pads in occupied unit with zero patient-care interruption.

  • 320 outlets re-rated

    Electrical Box Compliance

    Senior living renovation

    Re-rated 320 outlet locations across two floors during a 5-night phased schedule.

  • 1,200 LF · weekend turnaround

    Wall Stenciling

    Surgical center

    Stenciled 1,200 LF of barriers across two floors in a single weekend turnaround.

  • 4 buildings standardized

    Wall Stenciling

    Long-term care campus

    Standardized barrier identification across 4 buildings ahead of state survey.

Need a tailored case study for your facility type?

Request a packet

Resources

Inspection-ready templates. Free to download.

The same checklists and templates our crews use in the field — built to pass AHJ and Joint Commission surveys.

Inspection Readiness Checklist

4 pages · PDF

A 28-point pre-survey walkthrough used by our crews before every AHJ and Joint Commission inspection.

Email required below

Barrier Documentation Template

Spreadsheet template · XLSX

Standardized barrier-by-barrier log: location, rating, deficiencies, photos, UL system reference.

Email required below

Above-Ceiling Survey Template

6 pages · PDF

Field-tested survey form for above-ceiling deficiency mapping with photo log and remediation scope.

Email required below

We'll never share your email. One unlock gives access to all checklists.

Built to pass.

Don't wait for a failed inspection.

Let our team walk your facility, identify deficiencies, and deliver a code-compliant correction plan — fast.